Stove installation - Step #1:I removed the existing LP wall heater. This heater was not safe for living spaces...good for garages. If anyone needs/wants one, let me know.
Stove installation - Step #2:Putting up the cement board on the wall and floor. Under the floor is 3/4" particle board to fortify the floor. My plan is to tile the board with rocks I've rock hounded over the years. One of my winter projects includes cutting and polishing rocks :)
Stove installation - Step #3:The stove in place! Wahoo!! Even with using an appliance dolly to wheel it into place, it was difficult to move. It's here to stay :)
Underneath each leg of the stove is a 1/2" piece of wood. The wood is a spacer and will be removed when I tile the hearth.
Stove installation - Step #4:Chimney fascia framed and set.
Stove installation - Step #5:Four foot section of pipe installed!
Stove installation - Step #6:Chimney "thimble" attached to stove pipe. The thimble is connected to double-walled stainless steel chimney which reaches 30" to the roof....
Stove installation - Step #7:...and 6' feet of double-walled stainless chimney with rain cap to finish it off. The chimney sealant has to cure for 24 hours and then I can fire it up! :)